Skip to AxiomPM

Project and portfolio management

Plan it your way.
Keep one version of the work.

Run predictive, Scrum and Kanban projects from the same underlying work items—without losing history when the method changes.

Available now · Self-hosted · Predictive, Scrum and Kanban

AxiomPM project portfolio overview
AxiomPM interface preview. Demonstration data shown.
Three project methods
Plan, backlog and board views over one data set
Safe switching
Hidden method-specific fields keep their values
Flexible authority
Instance and project roles you define
Operational ownership
Your server, backups, identity and audit trail

Product capabilities

Built around the work your teams do every day.

Practical controls for execution, coordination, evidence and management visibility—inside an environment your organisation governs.

01

Predictive planning

Build a work breakdown structure with four dependency types, lag and lead, constraints, working calendars, total float and critical path.

02

Baselines and control

Capture baselines, compare delivery against the approved plan and retain the audit history behind schedule changes.

03

Scrum delivery

Rank the backlog, plan sprints, estimate with story points and organise work through epics, issue types and configurable statuses.

04

Kanban flow

Use lists, cards, labels, checklists, due dates, cover colours and work-in-progress limits to manage continuous flow.

05

One model, three views

Switch a project template without destroying values. Returning to a previous method restores the fields that view uses.

06

Portfolio insight

See progress, health, risk and overdue work across projects, with advanced reporting available for deeper analysis.

07

Roles you define

Combine 44 permissions into organisation-specific roles and apply them globally or differently from project to project.

08

Automation and integrations

Use automation rules and project XML import/export in licensed editions to connect project controls with surrounding tools.

09

Traceable operation

Protect project history with tamper-evident audit records, two-factor authentication, controlled upgrades and documented backup/restore.

Inside AxiomPM

See the work, not just the feature list.

These product interface previews illustrate how information is brought together for users. Figures and names are demonstration data.

Why choose AxiomPM

Operational depth with infrastructure control.

AxiomPM is designed for organisations that want capable business software without surrendering ownership of the operating environment and data.

Choose the method that fits the work

Use formal scheduling where dependencies matter, Scrum where time-boxed delivery fits, and Kanban where flow matters—inside one platform.

Change method without starting again

A method switch changes the presentation, not the underlying record. This supports evolving projects without spreadsheet rework.

Shape authority around real responsibilities

Create roles from granular permissions and apply different authority to the same person across different projects.

Keep the project record in your environment

Run the application, database and attachments on infrastructure controlled by your organisation.

Reduce deployment moving parts

The application uses PostgreSQL for data and live board events, avoiding a separate Redis service in the standard architecture.

Support both operational and governance views

Teams work in plans, backlogs and boards while managers see portfolio health, risk, baselines and audit evidence.

Deployment and ownership

Your environment.
Your operational record.

Conpeta can support requirement review, deployment planning, data migration, configuration, training and ongoing product support.

Deployment
Docker-based installation for Linux and Windows environments
Application
React interface with FastAPI backend, served from one origin
Database
PostgreSQL with live updates through LISTEN/NOTIFY
Security
Automatic HTTPS option, MFA, account lockout and audit trail
Continuity
One-command backup and restore with documented upgrades
Licensing
Offline-validating editions suitable for isolated installations

Your questions

A closer look at AxiomPM.

Have a specific process, integration, security or deployment requirement? Talk to Conpeta.

Can one organisation use different project methods?

Yes. Each project can use predictive, Scrum or Kanban presentation while sharing a consistent platform, people model and history.

What happens when a project changes method?

The switch is reversible. Fields hidden by the new method retain their values and reappear if the earlier presentation is restored.

Can project permissions differ from company-wide roles?

Yes. Roles can apply across the instance or within a specific project, so responsibility can vary project by project.

Can it run on an internal network?

Yes. AxiomPM is designed for self-hosted operation and its licence can be validated offline.

Does it integrate with Microsoft Project files?

Licensed editions support Project XML (MSPDI) import and export. Conpeta can review compatibility against your current planning files.

AxiomPM by Conpeta

Bring your operation
into clearer view.

Tell us how the work is managed today and what needs to improve. We will show how AxiomPM could fit your processes, infrastructure and governance requirements.